Problem

We listen

The Field Museum needed to replace an existing AHU in their Southwest Quadrant with a new 75,000 CFM unit and all associated ductwork, electrical, plumbing, controls, finishes, and exhibit protection, as the existing AHU didn’t have enough CFM to feed it.

Solution

We respond

DePue had to break down the new HVAC system into 52 individual sections in order to get it into the building from the ground level, up the elevator to the 3rd floor, and finally through a 36” man door in order for all 52 pieces to be assembled into one operational Air Handler Unit.

Results

We deliver

DePue managed to complete the breakdown and installment of the new unit safely, and was able to get it done without disrupting anyone or any processes. Better airflow was achieved throughout the Southwest Quadrant of the museum, all fine-tuned to not damage any of the artifacts in the museum.